Next: 19981124: , rigid ions
Up: MD work on
Previous: 19981117: going on with
19981119: going on with the simulation of 19981113
Let the simulation started in section 5 (and continued in
section 7) go for another
time steps, just to see
what happens.
It looks like things become better and better as the number of
configurations (or the simulation time or both?) in the
HISTORY file grows.
Let's summarize the calculations in 19981113 19981117 and 19981119.